Scope of Work
Install new horsepower and associated equipment to modernize the existing station. The existing units are at the end of their useful life cycle, causing reliability issues and the replacement parts are difficult to obtain. This project also includes the demolition and removal of the existing units. The new horsepower upgrade includes two reciprocating compressor/driver packages consisting of a Caterpillar G3608LE A4 engine and an Ariel KBD/6-1/2 compressor.
Industry
Oil & Gas
Client
TC Energy
Location
Artemas, PA
Manhours
89,691
Duration
Fabrication – 6 months
On-site Construction – 13 months