Tricia Ferry Frate and Rachel Barber are leading VEC into the future as second-generation owners.

Leading with Legacy: Tricia Ferry and Rachel Barber Step into the Future of VEC

At VEC, leadership has always been about more than titles. It’s about grit, heart and a deep commitment to people. That legacy, built by Rex Ferry over decades, is now being carried forward by the next generation; his daughters, Tricia Ferry Frate and Rachel Barber.

As Rex begins the process of transitioning ownership of VEC, Tricia and Rachel are stepping into expanded leadership roles, bringing with them a powerful blend of experience, vision and values rooted in the company’s DNA. They are joined by Jeff Barber and Dominic Spelich, who together with Tricia and Rachel form VEC’s executive leadership team. This group is united by a shared commitment to leading with integrity, fostering a strong company culture and driving VEC forward with clarity and purpose.

Growing Up VEC

For Tricia and Rachel, VEC isn’t just a company, it’s part of who they are. From cleaning offices and washing trucks as teenagers to now helping lead the organization, they’ve seen every side of the business. That hands-on experience has shaped their leadership style: humble, people-focused and driven by purpose.

“We didn’t just grow up around the business, we grew up in it,” Tricia shares in this video. “We learned early on that leadership means showing up, doing the work and taking care of your people.”

A Shared Vision for the Future

While their leadership styles are distinct, Tricia and Rachel are united by a shared vision: to honor the legacy their father built while continuing to evolve VEC for the future.

  • Tricia brings a strong operational mindset and a deep understanding of VEC’s culture. She’s passionate about building teams, developing people and creating a workplace where everyone feels valued.
  • Rachel plays a critical role in ensuring VEC remains a financially strong and strategically positioned company. Her focus on financial health and long-term sustainability helps guide the company’s growth with confidence and clarity.

Together, they represent a powerful balance of tradition and transformation.

Carrying the Torch, Together

The transition of ownership isn’t just a business move; it’s a generational milestone. It reflects Rex’s confidence in his daughters and their ability to lead with integrity, empathy, and vision.

“We’re not trying to fill our dad’s shoes,” Rachel says. “We’re building on what he started and making it our own—together.”

Their leadership is already shaping the next chapter of VEC, one that’s rooted in relationships, driven by innovation, and committed to community.

The story of Tricia and Rachel is more than a leadership transition. It’s a testament to what happens when legacy and leadership align. As they step into this new chapter, they’re not just continuing a family business. They’re redefining what it means to lead with heart.

And the future of VEC has never looked brighter.

A set up rolled up construction drawings sitting on a wooden table.

The Power of Pre-Planning: How VEC Sets Projects Up for Success

In the complex world of construction, success isn’t just measured by what happens on the job site. It’s often determined long before a single tool is lifted. Pre-planning is one of the most critical phases of any construction project, and at VEC, we’ve built a proven process that helps ensure every job gets off to the right start.

Why Pre-Planning Matters

Effective pre-planning can save time, reduce costs, enhance safety and eliminate unnecessary rework. It brings clarity to complex projects and allows for smarter decision-making across the board. When construction teams begin a project with a well-developed plan, they’re better equipped to meet deadlines, stay within budget and deliver quality results.

VEC’s Pre-Planning Approach

Pre-planning isn’t an add-on at VEC, it’s how we operate to ensure success. Here’s how we approach it:

Handoff Meetings Between Estimating and Construction Teams

Once a project is awarded, we begin with a handoff meeting between our estimating team and construction team. This is where all the valuable knowledge gained during the bid process gets transferred to the team responsible for executing the work. We review the scope, budget, schedule, risks and any pre-fabrication opportunities identified during estimating. This meeting ensures a seamless transition from planning to action and sets a clear path forward for execution.

Trade Coordination

Job sites are busy, dynamic environments. That’s why we coordinate closely with other trades before work begins. Our goal is to identify areas where we may not yet have access and plan our work accordingly. By understanding what’s happening around us on site, we can minimize delays and avoid clashes that might otherwise derail the schedule.

Site-Specific Safety Planning

We approach every project and every task at VEC with safety at the top of the priority list. Before any work begins, we develop a site-specific safety plan tailored to the unique hazards of the project. This plan helps identify potential risks early and outlines the mitigation strategies we’ll implement to keep our people safe every day.

Identifying Pre-Fabrication Opportunities

We believe in working smarter, and pre-fabrication is one of the best ways to do just that. While estimating, we look for opportunities to build components in our fabrication facility, which can improve quality and reduce on-site labor. But we don’t stop there: our construction team continues evaluating opportunities as the project unfolds. Sometimes, conditions in the field allow us to pre-fabricate more than originally planned, increasing efficiency and cutting down on install time.

Pre-planning is essential to the success of any construction project. At VEC, our process ensures that every team member is aligned, every risk is addressed and every opportunity is leveraged before boots hit the ground. It’s how we deliver consistent results, reduce surprises, and build with confidence, job after job.

 

 

A VEC team member shaking hands with a new client.

Client Partnerships: Why Relationships Drive Everything We Do

At VEC, we believe the best projects don’t start with a bid. They start with a conversation.

Our approach to project pursuit is rooted in one core belief: relationships matter more than transactions. We’re not just looking for projects, we’re looking for partners who value collaboration, trust and long-term success as much as we do.

Building Before We Build

Before we ever step onto a jobsite, we’re already building. Building relationships, alignment and shared vision. We invest time upfront to understand our clients’ goals, challenges and values. That early alignment sets the tone for everything that follows.

We don’t chase every opportunity. Instead, we pursue projects where we can bring real value and where the client is equally committed to a collaborative process. That’s where the magic happens.

What a True Partnership Looks Like

To us, a successful partnership is defined by:

  • Open communication from day one
  • Mutual respect for each other’s expertise
  • Transparency in both planning and execution
  • Shared accountability for outcomes

When both sides are aligned, we’re able to move faster, solve problems more creatively and deliver better results. It’s not just about completing a project; it’s about building something we’re all proud of.

Why It Works

This relationship-first approach leads to:

  • Stronger project outcomes: Fewer surprises, better coordination and smoother execution.
  • Repeat partnerships: Many of our clients come back to us for future work because of the trust we’ve built.
  • A better experience: For everyone involved—from owners to trade partners to our internal teams.

A Better Way to Build

We’ve seen firsthand how powerful it is when clients and builders operate as one team. It creates an environment where innovation thrives, challenges are tackled head-on and everyone is working toward the same goal.

That’s the kind of work we want to do. That’s the kind of partner we want to be.

If you’re looking for a construction partner who values relationships as much as results, let’s start a conversation.

Because at VEC, we believe the strongest foundations are built on trust.

Two welders complete pre-fabrication of piping for a construction project at VEC.

5 Ways Pre-Fabrication Improves Project Efficiency

In the construction industry today, efficiency and safety are at top of mind. One strategy VEC uses to improve both is the use of prefabrication. By assembling components off-site in a controlled environment and delivering them to the job site ready for install, prefabrication offers several advantages over on-site construction. Here are five ways that prefabrication helps with project efficiency.

1. Prefabrication Reduces On-Site Labor

VEC has prefabrication facilities for mechanical and process piping, electrical components and structural steel. All fabrication is done in a controlled environment and reduces the need for extra on-site labor.

Fewer workers on the job site reduces congestion, improves safety and can lower labor cost.

2. Prefabrication Speeds Up Project Timelines

Our team prefabricates components during other phases of the project, helping to compress the schedule. While our team is on-site doing beginning phases of the project, our fabrication team is at work constructing certain components for install. This allows for simultaneous work and it can help to bring in the project schedule.

Parallel workflows can lead to faster project delivery.

3. Prefabrication Improves Quality Control

Weather conditions, site-specific challenges and labor can all contribute to quality issues. With prefabrication occurring in a controlled environment, VEC is able to mitigate several problems that could occur on a job site.

Assembly isn’t occurring in the elements or in tight spaces, reducing the need for rework and saving time.

4. Prefabrication Simplifies Coordination Across Trades

Space to work can be at a premium on job sites and coordination can be a challenge. Prefabrication allows for better coordination because assemblies (like piping skids, panel racks or structural pieces) can be built off-site. This can help to reduce time spent in a tight area completing the installation.

Prefabricated assemblies mean fewer coordination issues on site and faster progress.

5. Prefabrication Enables Just-In-Time Delivery and Installation

With prefabrication, components arrive when they are needed and ready for installation. This eliminates the need for long-term storage or laydown on site, which isn’t available in some locations, reduces the risk of material damage or loss and allows the construction team to install the components with minimal handling.

Pre-fabrication isn’t just a trend, it’s a proven strategy for increasing efficiency across the board. From reducing costs and timelines to improving quality, prefabrication offers a smarter way for VEC to construct projects. As the industry continues to evolve and labor becomes more of a premium, embracing pre-fabrication will be key for staying competitive and exceeding the expectations of our clients.

Ready to build smarter? Discover how VEC’s prefabrication capabilities can streamline your next project. Connect with our team today.