Scope of Work
Horsepower upgrade to an existing two unit station. The work included:
- Replacing two Dresser Rand compressors with two Ariel KBB 6s – the largest compressor that KBB manufactures
- Compressors were removed and installed using gantry cranes and mobile cranes
- VEC performed the complete packaging and installation of the new compressors which included assembling the compressor, crankshaft and pistons, installing the motor package, complete flywheel and performing a hot alignment
- Removing the existing 18-inch concrete pad in the compressor building and pouring a 60-inch concrete slab
- Upgrading existing station control panels and the two unit control panels
Industry
Oil & Gas
Client
TC Energy
Location
Downingtown, PA
Manhours
30,166
Duration
6 months