Scope of Work
The Garden State Expansion Project consisted of the installation of a grassroots compressor station and a grassroots meter station in Burlington County, New Jersey.
SCOPE OF WORK – STATION 203
Electrical installation of a one unit, 30,500 HP Solar C75 electric driven grassroots compressor station; the scope of work included:
- Site grounding
- Site lighting
- Building lighting
- Cathodic protection
- Cathodic protection rectifier
- Backup generator
- VFD
- Power building shipping splits
SCOPE OF WORK – CHESTERFIELD METER STATION
Electrical installation of a grassroots meter station; the scope of work included:
- RTU building
- Meter skid with building
- Filter separator
- Stand-by generator
Industry
Oil & Gas
Client
LMC Industrial Contractors
Location
Chesterfield, NJ
Manhours
23,000
Duration
10 months