MARKETS

MANUFACTURING

Manufacturing Contractor

Throughout VEC’s 50-plus year history, we’ve helped to construct manufacturing facilities at home and across the country. Our extensive experience allows us to provide a single, electrical construction solution or a complete general construction package for your next facility upgrade or expansion.

Industrial

Aptiv Press Relocation

Location: Warren, OH

Installation of two WDO presses at Aptiv Plant 10. The work included electrical, mechanical/plumbing, press assembly, floor coating and a temporary partition.

Power

Ultium Battery Plant Switchyard

Location: Lordstown, OH

Installation of a 138kV switchyard, overhead power lines and transmission line. VEC installed 60MVA 138kV transformers, circuit breakers, neutral grounding resistors and gang operated switches. We furnished and installed all aluminum external bus work, insulators, PTs, CTs, LAs, CCVTs, installed all exterior lighting and branch circuit wiring as well as installed all grounding in the switchyard.

Industrial | Systems Integrator

Great Lakes Cheese

Location: Hiram, OH

Electrical installation of a new manufacturing area addition. VEC installed building power, lighting, fire alarm system and technology package that included a new single-mode and multi-mode fiber backbone connecting the existing facility with the newly constructed facility and all data cabinets in between.

Industrial | Systems Integrator

Vallourec Star

Location: Youngstown, OH

Unit addition and upgrades to an existing gas compressor station. VEC installed an 11,110 horsepower Solar Taurus 70 turbine driving a C45 compressor at Unit 6 and performed controls upgrades to the existing compressor at Unit 5.

Industrial

Matalco

Location: Lordstown, OH

Unit addition and upgrades to an existing gas compressor station. VEC installed an 11,110 horsepower Solar Taurus 70 turbine driving a C45 compressor at Unit 6 and performed controls upgrades to the existing compressor at Unit 5.

Industrial | Systems Integrator

Universal Stainless

Location: North Jackson, OH

Unit addition and upgrades to an existing gas compressor station. VEC installed an 11,110 horsepower Solar Taurus 70 turbine driving a C45 compressor at Unit 6 and performed controls upgrades to the existing compressor at Unit 5.