Scope of Work
Electrical installation of a gas cryo plant. The scope of work included:
- Underground and aboveground conduit
- Installation of cable tray
- Fabrication and installation of uni-strut racks and junction boxes
- Wire pulling and terminations
- Tubing, device and transmitter installation
- Low voltage electrical
- Screw piping installation
Industry
Oil & Gas
Client
Tall Oak Midstream
Location
Colgate, OK
Manhours
52,687
Duration
13 months


