Scope of Work
Build out of mission critical space within the Ultium Cells 1 Battery Plant. The work on the data center proceeded while construction of the facility was still in progress. The work included:
- Metal stud framing of Computer Room, UPS Room, Ops center, and service corridor
- Rough-in of electrical and power
- Drywall hanging, taping and finishing
- Painting of all drywall
- Furnish and install of all doors, frames and hardware
- Provide epoxy floor coating of concrete surfaces
- Installation of UPS and Battery back up system
- Furnish and install of panels, transformers, cable tray to support the power distribution to the data center
- Provide clean agent fire suppression system
- Furnish and install drop ceilings
- Furnish and install access flooring within the computer room
- Provide carpet tile and base within Ops room
- Install owner provided equipment including server racks and wiring of PDUs
- Provide BIM modeling of all construction and integration into the facility construction model
- Coordination with mechanical contractor for installation of all cooling equipment
Industry
Automotive
Client
Ultium Cells
Location
Lordstown, OH
Manhours
5,454
Duration
5 months