Scope of Work
Electrical installation for the new pipe manufacturing facility; this project included six major areas:
- Heat treat line
- Quality assurance line
- Millside (high speed) straightener line
- Bundling line
- Threading line
- General areas for shipping and storage
Installed:
- Temporary power for one million square foot facility
- Medium voltage duct bank for entire facility
- Extensive underground concrete-embedded conduit system (over 750,000’)
- Cable tray systems for power, control, instrumentation and fiber optics
- Electrical transformers and switchgear
- PLC and remote I/O cabinets
- Complete network
- Closed circuit television
- Wireless access point
- Structured cabling
Assisted in the commissioning of:
- Furnaces
- Conveyor systems
- Compressors
- Pumps
- Hydraulic equipment
- Threading machines
- High speed straighteners
- Bundlers
- Substations
Industry
Manufacturing
Client
Vallourec Star
Location
Youngstown, OH
Manhours
472,800
Duration
48 months